Having declared a climate emergency in July 2019 和 adopted net zero carbon targets by 2030 in September 2020 we are now actively working with Worcestershire Local Enterprise Partnership, Worcestershire County Council 和 Worcester City council to develop decarbonisation strategies.

新黄金城集团的 热脱碳计划 sets out our desires to look at collaborative district heating opportunities 和 possible heat sources.  新黄金城集团的 能源和水战略 提出了新黄金城集团的方法,新黄金城集团投资了362英镑,088 in insulation 和 double glazing to improve the building fabric  in March 2021 和 have a further £1m investment planned for 2022. We have fully costed carbon reduction plans for all our buildings 和 an 能源 Committee chaired by the Director of Finance to establish priorities, finance 和 the strategic implementation of what is needed to meet our targets. This reports directly to the University Executive Board.

The Future Heat Programme has the potential to join with other heat networks in the city of Worcester 和 save 35,000 tonnes of CO2 emissions prevented over the system lifetime, a techno-economic study is looking at the feasibility of this approach. We installed three major PV solar systems across the estate during 2021, 总发电潜力为295 kWp.  新黄金城集团获得了100万英镑的奖金 偷看 funding to significantly increase the PV generation capacity, increase LED lighting 和 improve Building Management Systems. 

新黄金城集团的 Display 能源 Certificates (DECs) can be viewed here

能源目标

一大排太阳能电池板

2021-22年的SMART目标

GHGe目标

  •  5% p.a. reduction GHGe emissions in energy against a 2018/19 baseline from 2020 to 2030.

年度消费目标

  • An absolute energy consumption reduction of 901 MWh p.a. (5.9% p.a.) from 2019 to 2030, reducing consumption from 15,157 MWh in 2018-2019 to 4,348 in 2030-2031.  
  • A combined energy intensity reduction of target of p.a. 5.9% p.a. from 2019 to 2030, reducing consumption energy intensity from 162 kWh/GIA m2 in 2018-2019 to 53.2030-2031年56千瓦时/GIA m2.   

Some examples of how will we achieve our energy targets?

  • Continue replacement programme of LED lighting (The Garage) with smart controls final year of revolving green fund- ends March 2022 
  • 在竞技场安装AEH占用控制
  • Apply for funding to do second stage techno -economic feasibility of installing a heat network for 3 main campuses
  • 在车库安装光伏阵列, 皮尔森, Woodbury to increase our renewable electricity generation capacity
  • Run Student Switch Off in halls to encourage students to save energy 和 water Increase student participation in Student Switch Off by 2% on 2020/21 levels (487 students- 54% 0f 902 residents)
  • Approve new decarbonisation plan for 3 main campuses to align to net zero carbon targets in this academic year.

 